Your standard materials — defined once, available in every project.
Each template is a full rate analysis — concrete, brickwork, plastering, steel, formwork, flooring, earthwork and the basic rates of materials, labour and machinery behind them, built the way a CPWD analysis of rates is done. Create a new template from the default and change a little or a lot; a new project imports the template you pick as its own copy.
| Material | Qty | Unit |
|---|
Split stage by stage — Foundation, Ground Floor, each floor — with its own quantities and sub-total, then a grand total. Every quantity is the exact solid volume of what you drew: walls, openings, columns and beams are unioned in 3D so every shared corner, embedded beam or column and every opening is counted exactly once — no double-counting, for any layout. Edit any rate — totals update instantly.
Click below to download. Both files include click-through derivation so every line can be audited.